From: route@monster.com
Sent: Tuesday, December 01, 2015 2:36 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Primavera P6
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
OBJECTIVE: |
Sr. Project Controls Engineer
(Cost & Schedule)/Project Controls Manager with 18+ years of scheduling
and project controls experience on new construction, demolition, and
environmental remediation projects, as well as corporate portfolio project
management/project controls experience. Advanced skills in the use of P3e/P5,
P6, MS-Project, Open Plan, and MS-Office Suite. Strong communication and
team-building skills in support of the application of Project Management best
practices to support project teams in the delivery of projects on-time, on-budget,
and on-scope; expert in Earned Value Management Systems (EVMS). |
|
EXPERIENCE: |
9/2014 - 6/2015 |
XCEL Energy Inc. |
Becker, MN |
|
Industry: |
|||
|
|
|||
|
Providing Project Planning & Controls
support/services for the Engineering& Construction Team located at a
major Power Generation Station. |
|||
|
- Development, collaboration &
review of Project Estimates, assembly into overall Portfolio database;
monitoring Project Review & Approval process, producing and validating
Annual Budgets (~$85M/yr) and various “what-if” scenarios- Facilitating
Project Planning, producing resource-loaded Schedules in Primavera P6,
updating/maintaining on-going Project schedules, producing individual and
collective Monthly Progress Reports.- Assisting w/BIG picture process &
improvement, identifying and addressing bottlenecks. |
|||
|
10/2013 - 12/2013 |
E. KY Power Cooperative (Contract) |
||
|
Industry: |
|||
|
|
|||
|
- Provided scheduling expertise to
develop standards for Power Transmission and Substation Projects together
with Best Practices in defining Resources (roles, skill sets, etc.) to
establish a Portfolio Management System. |
|||
|
- Worked directly with Project
Managers to employ & refine template Schedules in P6, mentoring Critical
Path Methodology, defining work Tasks & Resources, building Logic &
establishing Baseline Plan(s).- Processed & analyzed Status updates,
following up with PMs to ensure accurate performance reporting. - Facilitated
inter-departmental coordination to further engage key elements – e.g. Human
Resources – and leverage experience from the Power Generation side of the business. |
|||
|
11/2012 - 2/2013 |
Pratt&Whitney - Apollo
Professional (Contract) |
||
|
Industry: |
|||
|
|
|||
|
Facilitated planning, functioned
as liaison between technical and management personnel, leading, mentoring,
developing overall master Schedule(s), integrating the various aspects of
work together with in-depth resource requirements, cost, risk, etc. using Primavera
P6 & SAP; secured a DOD ‘Secret’ Clearance. |
|||
|
5/2012 - 7/2012 |
TechSource/SHINE Nuclear Medicine
Technologies |
||
|
Industry: |
|||
|
|
|||
|
As a start-up company accelerating
the development of a new process for the production of Mo-99 isotope,
provided further development of an integrated P6 Plan for the next phase of
the Project. Mentored technical team members in the process of Work Breakdown,
Critical Path Method and Activity-based Costing to produce an attainable
schedule, “bottom-up” budget and documented Work Packages, utilizing DOE 413
guidelines for Integrated Project Teams. |
|||
|
10/2011 - 12/2011 |
Baker Roofing Company |
||
|
Industry: |
|||
|
|
|||
|
Having risen to 3rd largest in the
Nation, worked with core leadership on sustained growth via standardization
of work/ business processes together with Project Templates and Resource
loaded Schedules to produce a Corporate wide portfolio scheme in P6. Facilitated
work-process mapping, utilization (importing) of data from existing systems,
mentoring and process improvement techniques. |
|||
|
7/2011 - 8/2011 |
Prolific-Technology Group, DUF6
Conversion Project |
||
|
Industry: |
|||
|
|
|||
|
Provided support & expertise
to maintain/develop an integrated Plant Start-up & Facility Maintenance
Management Program using Primavera P6 |
|||
|
3/2011 - 5/2011 |
Honeywell-Shaw |
||
|
Industry: |
|||
|
|
|||
|
Facilitated planning & coordination
for Plant inspection/re-certification program together with integrating
on-going maintenance and outage requirements (from SAP) into a broad-picture
Plan/Schedule. |
|||
|
Provided planning & coordination
for Plant inspection/re-certification program, integrating on-going
maintenance and outage requirements from SAP & P3 schedules into a
broad-picture P6 |
|||
|
9/2008 - 6/2010 |
DeNuke Services |
Paducah, KY |
|
|
Industry: |
|||
|
|
|||
|
Providing Project Planning and
Controls services to major subcontractor(s) performing remedial/environmental
retoration Projects and Earned-Value progress reporting for the Dept. of
Energy. |
|||
|
Brought in by EnergySolutions, a
first-tier subcontractor to Paducah Remediation Services (DOE prime
contractor), to develop a detailed project plan for their portion of the site
remediation work. Plan was required to be in support of the DOE prime
contractor’s overall project plan, milestones, and cost allocation, in
support of projects involving the dismantlement, remediation and removal of
contaminated structures, equipment, and materials. Evaluated PRS’s overall
general plan to determine all contractually-estabished milestones, budgets,
and schedules, then established detailed working-level plan for
EnergySolutions to ensure sufficient scope definition, allow
resource-loading, and implement EVMS requirements. Required ability to
roll-up cost and schedule performance indices (CPI/SPI) into the overall general
schedule of the prime contractor, whlie providing the ability to accurately
reflect project cost, schedule, and scope performance of EnergySolutions’
portion of the work, which was integrated throughout the prime’s scope of
work. Maintain resource-loaded schedule in compliance with EVMS. |
|||
|
2/2008 - 7/2008 |
RMT - Smartburn |
Madison, WI |
|
|
Industry: |
|||
|
|
|||
|
Built Project Controls competency
using Primavera P5 enterprise framework to integrate corporate projects into
a single portfolio. Worked with individual project teams to train and develop
them to use a consistent approach. |
|||
|
Hands-on Project Controls Manager
brought on to transition from "Lone-Ranger" PM mentality to a
coordinated, process-driven Project Planning & Performance Measurement
organization. Working w/core Leadership, built a foundation for Project
Planning and Control - including Earned-Value metrics - on best practices in
methodology (Work Breakdown Structure, Critical Path Method, Resource
integration & Baselining techniques) and Enterprise software (Primavera
P5). Facilitated Team Project Planning, provided mentoring, technical
expertise and interface w/other Departments and Client/Owner(s). Established
standard periodic reporting; provided hands-on support and supervision of
Project Controls department personnel. |
|||
|
12/2007 - 2/2008 |
The Boeing Company |
Bellevue, WA |
|
|
Industry: |
|||
|
|
|||
|
Supported multiple
Product-Development Projects, providing scheduling and Cost-integration using
Primavera P5. Produced Earned Value reports; provided interpretation,
evaluation and troubleshooting of Schedule and Cost performance metrics. |
|||
|
2/2007 - 8/2007 |
MJ Electric |
Iron Mountain, MI |
|
|
Industry: |
|||
|
|
|||
|
Develop Project Planning and
integration methodology, performance measurement and reporting standards
employing Primavera 5.0 for large-scale, long term Strategic Alliance with
American Transmission Company's North portfolio ($3.8B, 10yr horizon). |
|||
|
2/2006 - 11/2006 |
Babcock & Wilcox |
Barberton, OH |
|
|
Industry: |
|||
|
|
|||
|
Lead Planner on large scale
($260M+) EPC Emmissions Scrubber Project, Design through Construction phase. Involved
in the development of standards, processes and implementation/transition from
P3 to Primavera Enterprise P5). |
|||
|
6/2005 - 1/2006 |
Wisconsin Public Service |
Green Bay, WI |
|
|
Industry: |
|||
|
|
|||
|
Led the development to establish
Project Cost and Schedule Controls based on Earned Value Management
principles together with an enterprise solution (P3e/C) for a $2Billion+
portfolio of Projects; recruited and coordinated department resources and
assignments. |
|||
|
2/2005 - 5/2005 |
Triangle Transit Authority
(Contract) |
Raleigh, NC |
|
|
Industry: |
|||
|
|
|||
|
Worked as owner's representative
to develop and establish the baseline budget and cost control scheme for a
$700M Regional Rail Project. Provided interface, audit and evaluation of
Contractor's project progress/performance reporting. |
|||
|
8/2003 - 8/2004 |
Powerware |
Raleigh, NC |
|
|
Industry: |
|||
|
|
|||
|
Developed and implemented Project
Process and Master Scheduling System (utilizing WBS, CPM and Primavera
Project Planner, Enterprise version (P3e)) to support the burgeoning $80
million/year Federal Systems & Integration Services Division.- Improved interdepartmental
coordination and communication together with providing top management an
up-to-date, comprehensive status and analysis tool for all Projects and
resource commitments.- Created and established standard procedures, reports
and training for System users; provided ongoing coaching and systems
support/maintenance |
|||
|
8/1999 - 12/2002 |
Caterpillar, Inc. (Building
Construction Products Division) |
Cary, NC |
|
|
Industry: |
|||
|
|
|||
|
Working alongside the established
New Product Introduction process, established a Project
Planning/Management/Master Schedule & Reporting System based on Earned
Value principles, providing a more effective means to model, evaluate and
manage and deliver Product programs on-time and on-budget.The scheme
encompassed more than 10 distinct Product Groups spread across 5 world-class
Facilities, producing nearly 35,000 machines per year. Specific duties, once
this infrastructure was established, included:· Facilitating the development
of Project Plans (WBS & Responsibility Assignment Matrix, detailed
Activity Network and task Schedules, Critical Path Analysis,
"crashing" the Schedule, Resource Loading & Leveling,
establishing the Baseline Schedule, etc.) and assimilating Project Teams.·
Providing Training in the Principles of Project Management and associated
software tools.· Management Reporting - preparation and presentation of
cross-product/composite reports representing status of on going &
proposed Product Programs as well as overall NPI/Project Management Program
vision and mission.· Overseeing regular maintenance of PM Plans, providing
analysis and technical assistance to Project Plan "owners". |
|||
|
7/1998 - 8/1999 |
Contract Engineering, Bayer & GlaxoSmithKline |
Raleigh, NC |
|
|
Industry: |
|||
|
|
|||
|
Provided Project Planning, Cost
& Schedule expertise to the Central Engineering Departments at major
pharmaceutical companies.Instituted a plant-wide Resource Assessment and
Management tool at Bayer Biological Products, evaluating numerous Facilities
Projects and multi-million dollar budgets to provide for Project
prioritization, coordination, resource assignment and optimal utilization.
Data/model was key to ensure timely commissioning of new multi-hundred
million dollar core product production facility Developed subsequent software
tools and associated training to provide this function directly to management
on an ongoing basis.Revamped the fiscal Project Plan development process at
Glaxo to utilize Baseline Budgeting techniques, integrating detailed
estimates from Project Teams with Primavera schedules; established benchmarks
for future annual budgets. |
|||
|
1/1993 - 7/1998 |
North Carolina State University |
Raleigh, NC |
|
|
|
|||
|
As a returning full-time adult
student, earned a Bachelor of Science in Industrial Engineering with a minor
in Business.Provided Industrial Engineering consulting services through the
NC State University Industrial Extension Services Department. Performed studies
and evaluated various manufacturing processes, documenting results and
providing implementation plans for automation and process improvement
strategies. |
|||
|
4/1990 - 1/1993 |
Chem-Nuclear Systems, Inc. |
Raleigh, NC |
|
|
Industry: |
|||
|
|
|||
|
Revitalized a troubled
large-scale, high profile Federally funded (DOE) strategic Facility
Development Project, restoring customer confidence by establishing an Earned
Value Management System, integrating various sub-contractor schedules
(Primavera, MS-Project) together in an Open Plan Master Schedule. -Designed
an innovative “rolling wave” fiscal management technique, receiving Official
State approval for implementation on this critical, politically sensitive
venture.-Fashioned powerful, data-driven cost and schedule performance
reports to evaluate the effectiveness of the Project Team; worked closely
with Management to identify problem areas and establish meaningful metrics,
track and evaluate trends, implement and report on remedial actions.-Created
and instituted an engaging employee training program, improving the Team's
awareness and understanding of Project Management concepts, reporting
requirements & performance measurement parameters. |
|||
|
2/1985 - 4/1990 |
Chem-Nuclear Systems, Inc. |
Columbia, SC |
|
|
Industry: |
|||
|
|
|||
|
PROJECT MANAGER on various
commercial & Government-funded Site Remediation, dismantlement &
Environmental Restoration field Projects e.g. “TRIGA” Nuclear Research
Facility, Michigan State University, Lansing, MI. Responsible for and
directly involved in all aspects of this turnkey Project, from bid
preparation through closeout phases. Provided interface between outside
vendors, Purchasing, and Engineering departments. Managed staff and
work crew of 15 people on-site, As SITE SUPERINTENDENT, managed all
on-site operations and administration, including customer relations, problem
resolution and the production of regular Progress Reports, Change Orders and
corrective action plans, as necessary. SITE HEALTH & SAFETY SUPERVISOR -
developed Safety and Radiological Controls Programs for on-site implementation;
instituted personnel Training programs and supervised the administration of
Health/Safety protocol on-site. RADIOLOGICAL CONTROLS TECHNICIAN - performed
various field surveys and laboratory analyses; brokered the shipment of
radioactive materials; served as the on-site technical representative. |
|||
|
EDUCATION: |
6/1996 |
North Carolina State University |
US |
|
|
|||
|
Major: Industrial
EngineeringMinor: Business ManagementCourses of particular interest:
Facilities Design, Managerial Economics, Simulation, Mfg. Methods, Stochastic
Models in Industrial Engineering, Introduction to Sports Science. |
|||
|
9/1984 |
Regents College |
US |
|
|
|
|||
|
Science Education |
|||
|
12/1980 |
US Navy Nuclear Power School |
US |
|
|
|
|||
|
Certified Engineering Laboratory
Technician and Nuclear Power Plant Mechanical Systems Operator |
|||
|
SKILLS: |
Skill Name |
Skill Level |
Primavera P3 |
Expert |
|
MS-Office Suite |
Intermediate |
|
MS-Visio |
Intermediate |
|
MS-Project |
Intermediate |
|
OpenPlan (Welcom) |
Intermediate |
|
Designer (Micrografx) |
Intermediate |
|
Primavera Enterprise (P6) |
Expert |
|
ms-excel |
Expert |
|
|
LANGUAGES: |
Languages |
Proficiency Level |
English |
Fluent |
|
|
INTERESTS & HOBBIES: |
Fixing & building things,
recreation/fitness, quality time w/family & friends, travel &
adventure! |
|
AFFILIATIONS: |
Project Management Institute |
Member |
|
Institute of Industrial Engineers |
Member |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||